PT DRA Instrumen Indonesia memiliki pengalaman pengerjaan Steam Water Analytical System (SWAS), Sampling Rack, dan Analyzer Shelter untuk berbagai project pembangkit listrik nasional.
Industrial Power Plant Projects
Portfolio project installation sampling rack, analyzer shelter, dan SWAS system di berbagai pembangkit listrik Indonesia.
| No | End User / Project | Main Contractor | Job Description | Remark |
|---|---|---|---|---|
| 01 |
PLN NP PLTU Pulang Pisau
Kalimantan Tengah // 2021
|
PT ABB Shakti Industri | New Installation Sampling Rack (2 Unit) | Analyzer Shelter |
| 02 |
PLTU Barru
Sulawesi Selatan // 2023
|
PT ABB Shakti Industri | New Installation Sampling Rack (1 Unit) | Analyzer Shelter |
| 03 |
PLTU Tenayan
Riau // 2023
|
PT ABB Shakti Industri | New Installation Sampling Rack (2 Unit) | Analyzer Shelter |
| 04 |
PLTU Bosowa Energi
Jeneponto // 2024
|
PT ABB Shakti Industri | New Installation Sampling Rack (2 Unit) | Analyzer Shelter |
| 05 |
PLTGU Belawan
Sumatera Utara // 2025
|
PT ABB Shakti Industri | New Installation Sampling Rack (2 Unit) | Analyzer Shelter |
Konsultasikan kebutuhan SWAS, Analyzer Shelter, dan Sampling Rack bersama PT DRA Instrumen Indonesia.